Selected Project Deployments
-
Body Worn Camera Fleet
Central Armed Police Force
Pan India
1,200 body worn cameras with 60 twenty-bay docking stations and a central evidence management deployment across 14 battalion locations.
-
Station Entry Screening
Zonal Railway Division
Eastern India
38 multi-zone door frame metal detectors and 42 hand held detectors commissioned across major and satellite stations, with a two-year on-site AMC.
-
Dual-View Baggage Screening
International Airport
North India
Six dual-view X-ray baggage scanners integrated into the departure hall screening line, including operator certification and TIP training.
-
Access Control & Screening
State Secretariat
West Bengal
Integrated boom barriers with RFID vehicle access, 12 walk-through detectors and a visitor management desk at four public entry gates.
-
Perimeter & Material Gate
Public Sector Refinery
Western India
Crash-rated boom barriers on eight gates with loop detectors, ANPR integration and contraband detection at the contractor entry point.
-
Lobby & Vault Screening
National Bank Currency Chest
Multi-state
Compact walk-through detectors and hand held units supplied to 26 currency chest locations with quarterly preventive maintenance.
-
Mass Screening Deployment
Examination Board
Multi-state
900 hand held metal detectors supplied within a 21-day window for a state-level recruitment examination covering 340 centres.
-
Discreet Lobby Screening
Premium Hotel Group
Metro Cities
Architecturally finished walk-through detectors and compact X-ray scanners installed across nine properties without disrupting guest flow.
Client names are generalised where supply agreements restrict disclosure. Verifiable performance certificates are issued for tender submissions on request.
- 0+Years of Experience
- 0+Happy Clients
- 0+Projects Completed
- 0 YearWarranty*
- 0/7After Sales Support
Why Our Rollouts Land on Time
Large deployments fail on logistics, not on hardware. We plan spare positioning, engineer availability and phased commissioning before the first unit ships — which is why 900 units across 340 centres landed inside three weeks.
- Committed delivery schedule attached to every purchase order
- Regional spare depots for fast-moving consumables
- Phase-wise commissioning so live sites are never fully offline
- As-built documentation and operator sign-off at handover
Looking for Bulk Order or Project Supply?